Latest Projects

The Brisbane City Ferries known as “City Cats” underwent a refit and upgrade program across 2022-2023. MPS were honored to assist with these projects completing the below across the fleet assisting with 8 vessels in total.
- Ventilation system upgrades.
- Hydraulic system maintenance and repairs.
- Raw water system repairs.
- Exhaust system repairs.
- Bilge pump replacement and piping repairs.
- Black water system repairs.
- Wet deck piping replacement, upgrades, and repairs.
- Driveline system maintenance and bearing replacement.
- Rudder gear repair and bearing replacement.
- Valve repairs and replacement.